Data Center Construction Manager
Role Overview
AECOM is seeking Data Center Construction Managers nationally.
The position is on site in Las Vegas, NV
Job responsibilities include and are not limited to the following:
• Manages all activities associated with assigned projects including but not limited to, pre-construction, design, construction phasing, closeout coordination, occupancy and warranty enforcement for multiple construction projects including new construction and renovation
• Organizes and coordinates construction activities with the client and client vendors, as well as other stakeholders as needed.
• Understands and has working knowledge of scheduling and critical milestone activities, understands logic of the schedule and basic construction means and methods.
• Plans and organizes reports, reviews documentation from multiple project teams working on projects assigned.
• May provide technical direction and guidance to others as needed as administers client policies, maintains close interface with project team, and ensures all facets of the project are constructed in accordance with design, budget, schedule and quality.
• Coordinate with the General Contractor and ensure Scheduling of all tests and inspections required by the Contract Documents or governmental authorities and arrange for the delivery of test and inspection reports to the OWNER and Architect.
• Review punch list submitted by others and verify that items on the punch list have been completed and corrected prior to recommending substantial completion to the Owner.
• Monitor construction work progress, process field construction documentation (RFI and submittal validation and logging), also provide engineering support and coordination of construction field activities with inspectors.
• Coordinate with the general contractor on required meetings and attend all site-based meetings.
• Coordinate project documentation with Project Controls (cost and schedule) reviewers.
• Review, provide comments and fully approve Pay Applications.
• Review and document condition of any off-site stored materials including gathering all the necessary insurances and bill of sales for Owner supporting pay application review and approval on behalf of the Owner.
• Participate in Technical evaluations for A/E, GC and vendor selection.
• Cost tracking and manage the Project budget.
Full Job Posting
At AECOM, we’re delivering a better world.
We believe infrastructure creates opportunity for everyone. Whether it’s improving your commute, keeping the lights on, providing access to clean water or transforming skylines, our work helps people and communities thrive.
Our clients trust us to bring together the best people, ideas, technical expertise and digital solutions to our work in transportation, buildings, water, the environment and new energy. We’re one global team – 47,000 strong – driven by a common purpose to deliver a better world.
Here, you will have freedom to grow in a world of opportunity.
We will give you the flexibility you need to do your best work with hybrid work options. Whether you’re working from an AECOM office, remote location or at a client site, you will be working in a dynamic environment where your integrity, entrepreneurial spirit and pioneering mindset are championed.
You will help us foster a culture of equity, diversity and inclusion – a safe and respectful workplace, where we invite everyone to bring their whole selves to work using their unique talents, backgrounds and expertise to create transformational outcomes for our clients.
We will encourage you to grow and develop your career with us through our technical and professional development programs and diverse career opportunities. We believe in leadership at all levels. No matter where you sit in the organization you can make a lasting impact on the projects you work on, the teams and committees you join and our business.
We offer competitive pay and benefits, well-being programs to support you and your family, and the development resources you need to advance your career.
When you join us, you will connect and collaborate with a global network of experts – planners, designers, engineers, scientists, consultants, program and construction managers – leading the change toward a more sustainable and equitable future. Join us and let’s get started.
Job Description
AECOM is seeking Data Center Construction Managers nationally. The position is on site in Las Vegas, NV
Job responsibilities include and are not limited to the following:
Manages all activities associated with assigned projects including but not limited to, pre-construction, design, construction phasing, closeout coordination, occupancy and warranty enforcement for multiple construction projects including new construction and renovation
Organizes and coordinates construction activities with the client and client vendors, as well as other stakeholders as needed.
Understands and has working knowledge of scheduling and critical milestone activities, understands logic of the schedule and basic construction means and methods.
Plans and organizes reports, reviews documentation from multiple project teams working on projects assigned.
May provide technical direction and guidance to others as needed as administers client policies, maintains close interface with project team, and ensures all facets of the project are constructed in accordance with design, budget, schedule and quality.
Coordinate with the General Contractor and ensure Scheduling of all tests and inspections required by the Contract Documents or governmental authorities and arrange for the delivery of test and inspection reports to the OWNER and Architect.
Review punch list submitted by others and verify that items on the punch list have been completed and corrected prior to recommending substantial completion to the Owner.
Monitor construction work progress, process field construction documentation (RFI and submittal validation and logging), also provide engineering support and coordination of construction field activities with inspectors.
Coordinate with the general contractor on required meetings and attend all site-based meetings.
Coordinate project documentation with Project Controls (cost and schedule) reviewers.
Review, provide comments and fully approve Pay Applications.
Review and document condition of any off-site stored materials including gathering all the necessary insurances and bill of sales for Owner supporting pay application review and approval on behalf of the Owner.
Participate in Technical evaluations for A/E, GC and vendor selection.
Cost tracking and manage the Project budget.
Minimum Requirements
- BA/BS plus four years of experience ior demonstrated equivalency of experience and/or education.
Preferred Qualifications
- Bachelor's degree in architecture, engineering, urban planning, construction management or related field.
- Ten years in Construction.
Additional Information
Sponsorship for US employment authorization is not available now or in the future for this position.
Relocation is not available for this position.
At AECOM, we are committed to maintaining a secure and trustworthy recruitment process and take any fraudulent hiring activity seriously. To support this commitment, all newly hired employees are required to attend an in-person Day 1 onboarding at an AECOM office location as a condition of employment.
Offered rate of compensation will be based on individual education, qualifications, experience, and work location. The range for this position is $95000 to $130000.
About AECOM
AECOM is proud to offer comprehensive benefits to meet the diverse needs of our employees. Depending on your employment status, AECOM benefits may include medical, dental, vision, life, AD&D, disability benefits, paid time off, leaves of absences, voluntary benefits, perks, flexible work options, well-being resources, employee assistance program, business travel insurance, service recognition awards, retirement savings plan, and employee stock purchase plan.
AECOM is the global infrastructure leader, committed to delivering a better world. As a trusted professional services firm powered by deep technical abilities, we solve our clients’ complex challenges in water, environment, energy, transportation and buildings. Our teams partner with public- and private-sector clients to create innovative, sustainable and resilient solutions throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. AECOM is a Fortune 500 firm that had revenue of $16.1 billion in fiscal year 2025. Learn more at aecom.com.
What makes AECOM a great place to work
You will be part of a global team that champions your growth and career ambitions. Work on groundbreaking projects - both in your local community and on a global scale - that are transforming our industry and shaping the future. With cutting-edge technology and a network of experts, you’ll have the resources to make a real impact. Our award-winning training and development programs are designed to expand your technical expertise and leadership skills, helping you build the career you’ve always envisioned. Here, you’ll find a welcoming workplace built on respect, collaboration and community—where you have the freedom to grow in a world of opportunity.
As an Equal Opportunity Employer, we believe in your potential and are here to help you achieve it. All your information will be kept confidential according to EEO guidelines.
ReqID: REF59381I
Business Line: PPM
Business Group: DCS
Strategic Business Unit: East
Career Area: Construction
Work Location Model
- On-Site
Compensation
- USD 95000 - USD 130000 - yearly
About AECOM
Global infrastructure consulting and professional services firm.
Visit company websiteJobs and hiring trendsApply for this job in 1 click
Skip the repetitive application forms
Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.
Trusted by over 500,000 job seekers on Base Career
More from this employer
More jobs at AECOM
Senior Manager - Construction (High-rise)
Riyadh, KSA
AECOM is seeking a construction manager to lead high-rise projects through the full project lifecycle. The role requires 20 years of progressive construction management experience, including 10 years on high-rise or comp
Senior Mechanical Engineer – Mines and Ports
Greater Sudbury, CAN
AECOM seeks a Senior Mechanical Engineer to deliver capital and sustaining-capital projects for mine and port operations. The work spans mechanical design, project delivery, site support, troubleshooting, safety, and cli
Material Inspector
Abu Dhabi, UAE
AECOM is seeking a Lab Technician to test construction materials for infrastructure projects and verify compliance with specifications and quality requirements. Candidates need a relevant diploma or technical qualificati
Engineer - Electrical
Dubai, UAE
AECOM is seeking an Electrical Engineer to deliver electrical and dry-utilities infrastructure designs across project stages, including utilities, telecom infrastructure, and street lighting. Candidates need a bachelor's
Land Surveyor – Infrastructure & Bridges
Abu Dhabi, UAE
AECOM is seeking a Land Surveyor to inspect and verify surveying and setting-out work for infrastructure and bridge construction. Candidates should have a relevant diploma or degree, infrastructure surveying inspection e
Senior Structural Engineer
Halifax, CAN
Graduate Construction Project Engineer – AECOM Hunt
Dallas, USA
Senior Civil / Environmental Engineer
Columbus, USA
Senior Manager - Construction (High-rise)
Riyadh, KSA
Senior Mechanical Engineer – Mines and Ports
Greater Sudbury, CAN
Material Inspector
Abu Dhabi, UAE
Engineer - Electrical
Dubai, UAE
Land Surveyor – Infrastructure & Bridges
Abu Dhabi, UAE