{bc}
company_site

Construction Scheduler - Columbus, OH

CMTS
Columbus, USA
Full-time
Mid
Onsite
$70.00 / hour
Discovered 1 weeks ago

Full Job Posting

What You’ll Do

  • Analyze and interpret detailed construction documents (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil) to develop a comprehensive understanding of project scope
  • Review Contractor Primavera P6 baseline schedules to identify scope gaps, missing logic, milestone inconsistencies, critical path validity, and cost-loading accuracy; provide formalized technical review comments using standardized templates
  • Evaluate monthly Contractor schedule updates, documenting milestone delays, critical path impacts, and overall schedule health through structured reporting
  • Perform QA/QC reviews of contractor schedule submittals to ensure contractual compliance
  • Develop Earned Value Management (EVM) curves and perform associated performance analysis Conduct critical path method (CPM) and earned value analyses to assess schedule performance
  • Monitor construction progress, identify schedule risks, and recommend mitigation strategies to recover or improve project timelines
  • Develop or review preliminary construction schedules based on design documents and specifications
  • Generate and analyze Key Performance Indicators (KPIs) derived from Primavera schedules and EVM data; prepare variance reports including root cause analysis and recovery recommendations
  • Perform Time Impact Analyses (TIA) utilizing Window Analysis techniques, incorporating both contemporaneous and forensic schedule evaluation methodologies
  • Interpret contract documents to determine scope applicability and evaluate entitlement for compensable and non-compensable time extensions
  • Communicate schedule-related issues effectively during project meetings and coordinate with stakeholders to resolve concerns
  • Maintain and update program-level and master schedules, ensuring consistency with established coding structures, layouts, and reporting standards
  • Prepare technical reports as required by senior management
  • Conduct site visits, attend coordination meetings, and validate contractor-reported progress against actual field conditions
  • What You Can Expect from CMTS
  • Opportunities to work on high-impact infrastructure projects across the United States and the U.S. Virgin Islands
  • Collaborative and growth-focused team environment
  • Competitive compensation
  • CMTS LLC offers 100% company-paid medical, dental, vision, 401k, life, and long-term disability insurance coverage for the employee
  • Career advancement and professional development opportunities
  • Salary Requirements
  • $70.00 per hour
  • Apply Now!
  • https://cmtsllc.com/careers/
  • Equal Employment Opportunity
  • CMTS, LLC is an Equal Opportunity Employer that does not discriminate based on actual or perceived race, creed, color, religion, alienage or national origin, ancestry, citizenship status, age, disability or handicap, sex, marital status, pregnancy, veteran status, sexual orientation, genetic information, arrest record, or any other characteristic protected by applicable federal, state, or local laws. Our management team is dedicated to this policy with respect to recruitment, hiring, placement, promotion, transfer, training, compensation, benefits, employee activities and general treatment during employment

Qualifications

  • Bachelor’s degree from an accredited college or university in Architecture, Engineering, Construction Management, or a related discipline
  • Bachelor’s degree in any field from an accredited institution, supplemented by a minimum of six (6) additional years of Construction Scheduling experience in lieu of the specified degree

Apply for this job in 1 click

Skip the repetitive application forms

Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.

Sarah M.James T.Maya R.

Trusted by over 500,000 job seekers on Base Career

Start Free Today

More from this employer

More jobs at CMTS