Engineering Change Order (ECO) Engineer
Full Job Posting
The Engineering Change Order (ECO) Engineer is responsible for managing and coordinating the generation and revision of all engineering technical documentation through the Engineering Change Order (ECO) process.
This role ensures that design, documentation, and production updates are accurately documented, processed, communicated, and implemented across all departments.
- Defines, characterizes, and leads all aspects of Engineering Change Orders (ECO’s), included but not limited to engineering technical documentation generation and revision through the initiation, execution, and implementation of ECO’s.
- Monitor customer feeds for changes that may trigger an ECO.
- In depth review of all new specification and drawing updates to clearly identify changes.
- Assures sound engineering principals are applied to all processes and documentation.
- Develop a working understanding of manufacturing processes to facilitate collaboration with other engineers.
- Management of Methods of Manufacture (MOM) and Bills of Material (BOM) in current and future ERP systems.
- Actively listen, probe, and identify concerns. Develop credibility, loyalty, trust, and commitment, specifically with manufacturing subject matter experts.
- Other assignments as required.
- Requires a multidisciplined background with a focus on engineering documentation.
- Demonstrated success managing Engineering Change Orders
- Communication skills - must have good listening skills in addition to excellent verbal and written communication abilities.
- Excellent organizational skills, attention to detail, and documentation practices.
- Ability to multitask.
- A proven understanding of part and quality workmanship.
- Ability to analyze data and make recommendations.
- Must be capable and willing to share knowledge and develop associates.
- Bilingual English/Spanish a plus.
- Ability to work with all levels of personnel from company president to production associates.
Education & Experience
- Bachelor’s degree in mechanical engineering or similar technical field.
- Years Experience: 2+ years in engineering document control or related technical field.
- Experience working with engineering change orders or similar technical documentation a plus.
- Must be an intermediate to advanced skilled user of Excel.
- Familiarity with ERP systems preferred.
- Experience in a manufacturing environment a plus.
Working Conditions
- While performing the duties of this job, the employee occasionally works near moving mechanical parts and is occasionally exposed to wet and/or humid conditions, ambient air, fumes or airborne particles.
- The noise level in the work environment is usually moderate, but occasionally high requiring safety equipment to be utilized.
Physical Requirements
- The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job.
- Candidate must be able to perform the physical responsibilities of the job utilizing arms, hands, and fingers to perform complex functions of manufacturing parts and performing other duties of the job, e.g., standing, sitting, walking through the facility and stairs, bending, squatting, kneeling, etc.
- Ability to lift or move items weighing up to 50lbs preferred.
Pay : $65,000.000-$75,000/year
Benefits
Eligible after 1st day:
- Paid holidays
• Employee Assistance Program
Eligible after 90-day probation period:
- Medical, Dental, Vision, Basic Life/AD&D Insurance, Voluntary Term Life/AD&D Insurance
- Health Savings Account (HSA), Flexible Spending Account (FSA), Dependent Care Account, Commuter Transportation Management Account
- Vacation time
- Sick time
Eligible after 1 year of service:
- 401(k) with Employer Match
- Potential for discretionary bonus
The final pay offered to a successful candidate will be dependent on several factors that may include but are not limited to the type and years of experience within the job, the type of years and experience within the industry, education, etc.
We’re proud to be an equal opportunity employer.
This means we actively pursue ways to celebrate our differences and don’t discriminate based on an individual’s race (including traits historically associated with race, such as hair texture, hair type, and protective hairstyles including braids, locks, and twists), creed, national origin, nationality, religion, ancestry, age (40 or over), sex (including pregnancy), familial status, marital status, civil union or domestic partnership status, affectional or sexual orientation, gender identity or expression, mental or physical disability (including perceived disability, AIDS, and HIV status), atypical hereditary cellular or blood trait, genetic information, because of liability for service in military, status as a smoker or non-smoker, status as a registered medical marijuana user, or any unlawful criterion existing under applicable federal, state, or local laws.
If you need assistance or an accommodation due to a disability, contact us at [email protected].
About Alan Baird Industries
Specialty wire and cable manufacturer serving medical-device, mechanical-assembly, and robotics OEMs.
Visit company websiteJobs and hiring trendsApply for this job in 1 click
Skip the repetitive application forms
Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.
Trusted by over 500,000 job seekers on Base Career
More from this employer
More jobs at Alan Baird Industries
Spooling Inspector
Allendale, USA
Stranding Machine Operator
Allendale, USA
Assembly Operator
Allendale, USA
Set Up Technician
Allendale, USA
Machinist
Allendale, USA
Shipping Receiving Clerk
Allendale, USA
Quality Inspector (Mechanical parts)
Allendale, USA