{bc}
oracle

Cost Engineer - Data Center Construction

Sundt
Temple, USA
Full-time
Mid
Onsite
Discovered 3 weeks ago

Full Job Posting

Key Responsibilities

  • Assists in buyout phase as needed. 2. Distributes project documents. 3. Maintains/updates estimating databases (e.g. cost, subcontractors, etc.). 4. Performs quantity surveys. 5. Provides administrative support for Preconstruction Department and projects. 6. Solicits subcontractor pricing. 7. Solicits/develops pricing for hard bid and alternate delivery method projects.
  • Minimum Job Requirements
  • Experience: None required, however candidates with estimating experience or those who have completed internships during their educational career may be given preference over candidates with no experience. 2. Four-year engineering degree or equivalent combinations of technical training and/or related experience. 3. Preferred candidates will have obtained their LEED accreditation, or express willingness to obtain. 4. Proficient use of all Microsoft Office Suite programs.
  • Note: Job Description is subject to change at any time and may include other duties as assigned.
  • Physical Requirements
  • May stoop, kneel, or bend, on an occasional basis 2. Must be able to comply with all safety standards and procedures 3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 4. Will interact with people and technology frequently during a shift/work day 5. Will lift, push or pull objects pounds on an occasional basis 6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day. 7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
  • Safety Level
  • Safety-Sensitive Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
  • #LI-HW1

Qualifications

  • None required, however candidates with estimating experience or those who have completed internships during their educational career may be given preference over candidates with no experience. 2. Four-year engineering degree or equivalent combinations of technical training and/or related experience. 3. Preferred candidates will have obtained their LEED accreditation, or express willingness to obtain. 4. Proficient use of all Microsoft Office Suite programs.
  • Note: Job Description is subject to change at any time and may include other duties as assigned.
  • Physical Requirements
  • May stoop, kneel, or bend, on an occasional basis 2. Must be able to comply with all safety standards and procedures 3. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis 4. Will interact with people and technology frequently during a shift/work day 5. Will lift, push or pull objects pounds on an occasional basis 6. Will sit, stand or walk short distances for up to the entire duration of a shift/work day. 7. Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors
  • Safety Level
  • Safety-Sensitive Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.
  • #LI-HW1

Apply for this job in 1 click

Skip the repetitive application forms

Install the Base Career Chrome Extension and autofill job applications across major job boards with your profile.

Sarah M.James T.Maya R.

Trusted by over 500,000 job seekers on Base Career

Start Free Today

More from this employer

More jobs at Sundt